Lichfield Leisure Centre

Objectives

Lichfield District Council’s aim was to develop a new leisure centre that would benefit the local community and promote active lifestyles. Years in planning, the council were facing rising costs of construction and pressure on existing operational costs. Previously quoted costs for traditional construction methods were untenable for the council and alternative solution was needed. Lichfield DC approached ReCreation, initially for feasibility of an above ground pool option Additionally, the project brief required assessment of a new 3G pitch, an outdoor changing room, car park and landscaping.

Solutions

Having close collaboration with Lichfield District Council, planning teams, stakeholders, user groups, and extensive public consultation, the original brief was developed and enhanced. The pool design was updated to feature a varied depth from 1.2m to 1.8m, expanding its suitability for a broader range of users. This allows for activities such as diving instruction, competitive race starts, artistic swimming, and water polo, meeting the specific needs of the local swimming clubs.

Construction is currently underway, with completion expected in December 2025. The scheme is on track to achieve a BREEAM ‘Very Good’ rating, indicating strong environmental performance and efficient operational costs. The development will also deliver a Biodiversity Net Gain (BNG) significantly exceeding the 10% target, emphasising ReCreation’s commitment to sustainability and ecological enhancement.

Benefits

  • Healthier and improved community wellbeing
  • Significant capital saving on comparable quotes
  • Short construction time

Facts and Features

  • 25m x 6 lane swimming Pool
  • 11-a-side 3G football pitch
  • Spin studio
  • 85 station gym
  • Adaptable yoga, dance,  crossfit studio
  • Landscaping (Biodiversity Net Gain uplift 20%)
  • Social Value and community engagement
  • BREEAM: Very Good

Project Details

Contract Value: £12.5m

Client: Lichfield Council

Contractor:  Stepnell

Construction Time: 12 months

Opening Date: December 2025

“I am delighted that in ReCreation we have secured a company with the expertise to deliver exactly what Lichfield needs, endorsed by two of the finest swimmers this country has ever produced.”
Doug Pullen
Leader of the Council

Contact Us Today